South Frame Putahi Whakatetonga – Christchurch, New Zealand

Landscape Architects

Jasmax

Client

Crown

Head Contractor

Downer

Sub-Contractors

The City Care/JFC Joint Venture

An essential component to the Central Christchurch Recovery Plan is The South Frame. the aim is to build a town centre that’s green, people focussed and well-connected.

AluExcel was specified by Jasmax and installed by JFC to edge between the different pavement types of stone, asphalt and garden beds.

The edging provided tough, straight lines to work to and got rid of the risk of damage to edge paving machines while still giving a nice aesthetic view.

Products used in this project

AluExcel® Aluminium Landscape Edging

The ultimate edge restraint for hard landscape surfaces, whether it be asphalt, resin bonded or loose gravel, blocks, bricks or paving slab.

0 Shares
Tweet
Share
Pin
+1
Share